Basic Provisions for Acceptance  ±of Lift Works


Release time:

2022-06-16

Installation process referβ₹♦s to the construction site to guide the≥≥♦ installer to complete the operat™✘ ©ion of the technical documents✘♠×±, installation process can also ♥₽ ×be called installation manual ∏ ™→or installation instructions.↕φ 

I. The quality management of th₹®$♠e construction site of the ©₽installation unit shal± ©₹l comply with the following provisionδ₽∏γs:

  1. With perfect ac₽×∏≤ceptance standards, installa₩βπtion techniques and constr'$‌<uction procedures.

  2. With a sound installat<£ion process control s&<ystem.

  3. Installation process refer♠₽←φs to the construction site to guide €✘≠the installer to complete the operat↔δγion of the technical documents, installΩ§‌ation process can also be calleβφ d installation manual or instal↔αlation instructions.

  4. Installation process co‍φΩntrol system refers to the li ≈ft installation unit i♦₩∞εn order to achieve process control, t‍↑™he development of the upper an✘♠d lower processes be ∑₽tween the acceptance of tα↑→>he protocol.

  Second, the lift insta★‍↓±llation project constructio←∑n quality control sh"$all comply with the f<∑γ‌ollowing provisions:

  1. The civil constructio≠ γλn handover inspection sha&£εll be carried out according to↔↑£ this specification before©λΩ the lift installation.

  2. Before the installation "≈of the lift should be π↔in accordance with thγ∏✘<is specification for the acc☆↓eptance of the entry ∏ ​of the lift equipment.

  3. The sub-projects of lift i×≈↕nstallation shall be ≈σ♦quality controlled accordi• ng to the enterprise standard, an→¥d each sub-project shall hε☆ε→ave self-inspection record.

  Third, the quality acce±α​ptance of the lift installation pro"₹ject shall comply with the following prα$♥ovisions:

  1. The personnel who pε✘articipate in the construction an✔↕d quality acceptance of the installatio♥ n project shall have the correspondin★→✔g qualification.

  2. The unit undertaking the r≥ πelevant safety performance test'©ing must have the appropriate quali ₩fications. Instruments and¥↔≥ equipments shall meet ☆↕±✔the requirement of accuracy a‍≥₹↕nd shall be within the validi∏Ωδty period of verification.

  3. The quality acceptance ± of sub-projects should be carried¶'₽ out on the basis of self-inspectio↓Ω≥n by the lift installation unit.

  4. The quality of sub-pro♦☆✔jects should be checked and accepted acε®‍cording to the main control proje₽$☆→ct and general project respectλ★↔ively.

  5. Concealed works shall be notified €≤to the relevant units for i↕©↑nspection and acceptance before c♥®✘←oncealment after the lift installation↑λ $ unit passes the inspection and form t★γδ≈he acceptance document©".

Recommended News

Message

* Please fill in the demand i∑ ‌↕nformation carefully, we will co®$∞₽ntact you as soon as po↑÷¥δssible

Copyright©2023 Liyang Flλ ☆≈ying Industry Co., Ltd