Basic Provisions for Acceptance of Li™₽βft Works
Release time:
2022-06-16
Installation process refers to the ×®construction site to guide the ≤¶∏βinstaller to complete the oper<↕✘ation of the technical documents, ×★•installation process can also be call§₩ed installation manual or install☆®ation instructions.
I. The quality management o≠Ω÷f the construction site of t§he installation unit απγ₹shall comply with the following pro✔↕ ↕visions:
1. With perfect acc♣★eptance standards, installatβ∑ion techniques and construc₽βtion procedures.
2. With a sound insta∏∑llation process control ×₩system.
3. Installation process ref$δers to the construction site to ✔δguide the installer t•★∞o complete the opera∞∑↓λtion of the technical doc≥ uments, installation process can a$×lso be called installation manua>↓l or installation instruφ™∞ctions.
4. Installation process controσ∞l system refers to the lift installatioβ✔n unit in order to achieve proces ↔s control, the development of the uppeγ ♥r and lower processes between the a☆π♦cceptance of the protocol.
Second, the lift instal"σ♣lation project construction ✔₩×♠quality control shall comply wγ™₽≠ith the following provisions:
1. The civil construction h ♠andover inspection shall b☆♠e carried out according to this speci♦•σfication before the li±ft installation.
2. Before the installation of the l£ift should be in accordance $×Ωwith this specification for©¥ the acceptance of the entry of t¥•αhe lift equipment.
3. The sub-projectΩ≤s of lift installation shall™₽ be quality controlled according to th↕¥∏e enterprise standard, and each sub-pr&Ωoject shall have self-inspection ←γ↑φrecord.
Third, the quality acceptance of the ©≠±÷lift installation project shall comply£& with the following provisions:
1. The personnel whoφφ• participate in the construction₹♦¶& and quality acceptance of the§↕ installation project shall have t®¶£he corresponding qualific≤≤ ↑ation.
2. The unit undertaking the±♦∏ relevant safety performance testing mu∑&st have the appropriate qualificatio♥♣Ωns. Instruments and equipments shall₩✘€δ meet the requirement of accuracy ♣ and shall be within the validity perΩ∑€iod of verification.
3. The quality acceptance of sub-projλ★×γects should be carri ©™βed out on the basis of self-inspecti™ ®on by the lift installation ≥™unit.
4. The quality of sub-pβrojects should be checked andγ÷ ♦ accepted according to the main cγ♦•ontrol project and general ©♦÷project respectively.
5. Concealed works sha<₽₹ll be notified to the ±±∞relevant units for inspection and a↕↕cceptance before concealment af¶ter the lift installationγ✘ unit passes the inspe¥φction and form the accδ&eptance document.