Basic Provisions for Acceptan£β'∑ce of Lift Works


Release time:

2022-06-16

Installation process ref↓↓ers to the construction™≥ site to guide the installer ±δto complete the operation≠₽♥ of the technical documents,↕™ installation process can also beε∑£ called installation manual or♥±‌✘ installation instructi πφons.

I. The quality management of the con& ★÷struction site of the install ±✘‌ation unit shall comp☆↓ly with the following prov✔✔'isions:

  1. With perfect acceptance sta∑>πndards, installation techniqueπ ↔s and construction procedures.

  2. With a sound installati×↕✘on process control system.

  3. Installation process refers to t↓•he construction site t↔€¶♥o guide the installer to complα♠ete the operation of the technical docu♦©∞ments, installation process can a↔☆¥₹lso be called installatiγ↔on manual or installation inst♥±λructions.

  4. Installation process contr↓≈↓ol system refers to the lift installa↑∑"↓tion unit in order to achieve←♣↑¥ process control, the ✔ development of the upper anλ✔d lower processes between the a↔↓≠∞cceptance of the protocol.

  Second, the lift installation projec₩<€←t construction quality control shall •>¥‌comply with the following provisio≠™α✔ns:

  1. The civil construction handover☆ε inspection shall be caΩ→rried out according t<♦'≈o this specification before the lift iε ☆nstallation.

  2. Before the installation of th₩↕e lift should be in acc&'ordance with this specπ♥ification for the acceptance of theα≈& entry of the lift equi✘≠pment.

  3. The sub-projects of lift instal¶>​λlation shall be quality controlled β★according to the enterprise standar₹→φd, and each sub-project §™λshall have self-inspection re¶" βcord.

  Third, the quality accepta∏&>nce of the lift installation project₽∑≥§ shall comply with the following pr‍♥ovisions:

  1. The personnel who participate in ♥ the construction andε∏' quality acceptance of the installa≠σ↔©tion project shall have the correspo♦£∏nding qualification.

  2. The unit undertaking the relevantγ→ ‍ safety performance testing must £★≈have the appropriate qualifica​✔<tions. Instruments and equipments sλπ&♠hall meet the requirement‍∏ of accuracy and shall be within the $  validity period of verification.

  3. The quality acceptance♦× of sub-projects should be ca✔₹©rried out on the basis✔•♣  of self-inspection by the lλλift installation unit.

  4. The quality of sub-project®♥≠←s should be checked and ac₩ §cepted according to th∏™₹e main control project an∑₽φd general project respective✔ ₩♣ly.

  5. Concealed works shall  ≤×be notified to the relevant units for i→™<nspection and acceptance before conceal♦​♥φment after the lift installation unit p ←φasses the inspection and form the acπ ceptance document.